Best price per kg SPA-H corten steel plate

  • 10 - 24 Tons
    $750.00
  • 25 - 49 Tons
    $730.00
  • >=50 Tons
    $710.00
Thickness:
1-16mm
Shipping:
Support Sea freight · Land freight · Air freight
Lead Time:
Quantity(Tons) 1 - 10 11 - 25 26 - 50 >50
Est. Time(days) 7 10 15 Negotiable
Customization:
Customized logo (Min. Order: 50 Tons)
Customized packaging (Min. Order: 50 Tons)

More

Graphic customization (Min. Order: 50 Tons) Less
Samples:
$700.00 /Ton | 1 Ton (Min. Order) | Buy Samples
Report Suspicious Activity
Overview
Quick Details
Standard:
ASTM, bs, DIN, GB, JIS
Grade:
SPA-H
Place of Origin:
Shandong, China
Type:
Steel Plate, Hot Rolled Steel Sheet
Technique:
Hot Rolled
Surface Treatment:
Coated or as your requirment
Application:
Ship Plate
Special Use:
High-strength Steel Plate
Width:
1-1.2m
Length:
500-6000mm
Tolerance:
±5%
Product Name:
Hot Rolled Steel Plate
Surface:
Customer Requirement
Shape:
Flat Plate
MOQ:
5Tons
Packing:
Standard Seaworthy Packing
Delivery time:
Within 15-20 Days
Technology:
Hot Rlloed
Steel grade:
ASTM A36/A283-C/A516 Grade55
Material:
SPH-A
Payment term:
30%TT+70% Balance
Supply Ability
Supply Ability:
1000 Ton/Tons per Month
Packaging & Delivery
Port
Qingdao port or Tianjin port
Picture Example:
package-img
package-img
Lead Time :
Quantity(Tons) 1 - 10 11 - 25 26 - 50 >50
Est. Time(days) 7 10 15 To be negotiated
Product Description
Detailed Images
Packing&Shipping
FAQ
Q: Can we get sample?Any charges?
A: Yes,you can get available samples in our stock. Free for real samples, but customers need to pay the freight cost.
Q: How can we get the offer?
A: Pease submit the required steel grade, size, quantity. And we will check price for you at the first time.
Q: Do you handle pre-rusted process treatment yourself?
A: Yes, we are a professional corten steel products man
ufacturing factory providing full set of manufacturing service including laser cutting, NCT punching, bending, welding, grinding, polishing, pre-rusted treatment, etc.
Q: Why need pre-rusted treatment for the corten steel?
A: It takes long time to develop the stable rusty layer in nature. It can greatly affect the finish beauty of the corten steel,
especially the dropping of rust liquid and the flying of floating rust at the beginning of bare using. And pre-rusted treatment
can help the corten steel to be weathered in a short time and the color also can be controlled.
Q: Do you make customized products based on our design drawings or ideas?
A: Yes, we are a professional cortensteel manufacturing factory with an experienced engineering team to make customized products according to clients' drawings and ideas.

Q: What's your payment terms?
A: 30% down payment by T/T and 70% balance by T/T or L/C.
Q: What's your delivery time?
A: 15-45 days after receiving the down payment or L/C.


Application
Contact Us